Among the construction works, some are subject to building permits, others to prior authorization and others finally do not need any authorization. Here is the list of works subject to simple prior authorization or no authorization. In order to know more about the construction law, you must always take the help of the internet or some professional.

Construction works without administrative authorization

Some works are not subject to any administrative authorization no building permit, no prior authorization. This is work on small constructions outside protected or protected areas. Recreational homes built on a campground or in a residential park with a floor area of ​​less than 35 m2. Pools with a basin area of ​​less than 10 m2, and to find out more about the specific rules related to the construction of swimming pools, read the swimming pool building permit form.

  • Fences that are not subject to prior authorization
  • Walls less than 2 m high (except for fence walls)
  • Greenhouses with a height of less than 1m80
  • The retaining walls
  • Temporary constructions of less than three months

Caution all construction projects in protected or safeguarded areas must be subject to at least a prior authorization or a building permit of the exceptional and the temporary constructions of less than 15 days. To find out more about the building permit, read the “Building permit “sheet.

Construction the prior declaration

Some constructions, without being subject to a building permit, however require a prior declaration. This concerns the following constructions (located outside the protected or safeguarded areas), buildings that result in the construction of a floor area of ​​between 5 m2 and 20 m2. If the building plot is located in an urban area governed by a local plan, the area may be up to 40 m2.

Buildings whose height is greater than 12 m2

Recreational buildings located on a campsite or in a residential park with a floor area greater than 35 m2. Walls with a height greater than 2 m. Pools with a pool area of ​​between 10 m2 and 100 m2, and a roof height of less than 1m80, the green houses (or chassis) with a height greater than 1m80 (but less than 4m) with a floor area of ​​less than 2,000 m2.

What is the risk of building without a building permit?

For some constructions,
the issuance of a building permit is obligatory. If you make a building subject
to a building permit without having obtained the permit, you expose yourself to
sanctions. This is indeed an offense. The police forces may, following the
finding, seize the tribunal instance by demanding the
stop work (with confiscation of equipment) and the demolition of construction.